Phoenix · guide · checked October 2026

Phoenix freeway projects 2026–27 and your windshield.

4.5 on Google 16 reviews on our Phoenix profile 2,400+ installs in Phoenix

Work zones mean loose gravel, shifting lanes and haul trucks. This is the list of the big ADOT projects around Phoenix right now, with dates from the reports that quote ADOT, so you know which drives carry the most risk to your glass.

Rather text? Send a photo to (877) 350-5962

Why it matters

Work zones and flying stones

A cracked windshield often starts as a single stone strike. Freeway construction raises the odds for a simple reason: the road surface is torn up, shoulders are gravel instead of pavement, and trucks carrying dirt and aggregate share narrowed lanes with everyone else.

In 2026 the Phoenix area has more of that than usual. Maricopa County voters approved Proposition 479 in 2024, and the first projects it pays for began this year, on top of work already under way from the earlier regional freeway plan. The table below lists the ones a Phoenix driver is most likely to pass through.

The list

ADOT projects under way or starting

Timing is as ADOT gave it to reporters. Projects slip, closures change week to week, and ADOT posts current closures on its own site.

Phoenix-area freeway projects, 2026 and 2027 (checked October 16, 2026)
ProjectWhat is being builtTimingCost
Loop 303 at I-17, north PhoenixDirect freeway-to-freeway ramps at the interchange, and Loop 303 widened west to 51st Avenue. The first Prop 479 projectStarted late January 2026, finishing by 2028129 million dollars
Loop 303, 51st Avenue to Lake Pleasant ParkwayThree lanes in each directionStarting fall 2026Not published
Loop 101, I-17 to 75th AvenueTwo new lanes in each direction over 6.5 miles of the Agua Fria FreewayBegan September 2024, due spring 2027140 million dollars
I-10 and Loop 101 interchange, West ValleyAn elevated HOV bridge between the two freeways, wider lanes on both, and a new ramp from the southbound 202 to 91st AvenueAbout three years from spring 2026Not published
Loop 202 Santan Freeway, Loop 101 to Val Vista DriveTwo lanes each way to Gilbert Road, one each way to Val Vista, and wider bridgesBegan August 2024, due spring 2027200 million dollars
Loop 303 extension, Van Buren Street to SR 85, GoodyearAbout four miles of new freeway with 10 overpass bridgesClearing began June 2026, due about 2030613 million dollars
State Route 30, south of I-10A new West Valley freeway corridorConstruction scheduled 2027 to 2046Not published

The Loop 101 widening between Shea Boulevard and Princess Drive in Scottsdale (108 million dollars) was due to finish in early 2026 and is left off the list.

Where it bites

Which drives carry the most risk

North Phoenix has the most overlap. Anyone commuting on I-17 past Happy Valley Road now drives through the Loop 303 interchange work, and the Loop 101 widening runs west from the same freeway toward Glendale. A driver going from Deer Valley to the West Valley can pass through both on one trip.

The West Valley is next. The I-10 and Loop 101 interchange sits where traffic near 83rd and 99th Avenues is already heavy, and the Loop 303 extension in Goodyear adds earthmoving and haul trucks a few miles further west.

The East Valley's main zone is the Santan Freeway between the 101 and Val Vista Drive, due to wrap up in spring 2027. Central Phoenix and Ahwatukee are lighter this year, though every freeway sheds the odd stone.

Driving through

Fewer chips in a work zone

  • Leave more room behind any truck carrying dirt, gravel or rock. The stone that hits you usually comes from close in front.
  • Stay out of the lane next to a gravel shoulder when you have a choice.
  • Keep your wipers off a dusty windshield until you have washer fluid on it. Dry wiping drags grit across the glass.
  • If a stone hits, keep driving and check the glass once you are parked somewhere safe.

After a strike

What to note when a stone hits

Write down the freeway, the nearest exit, the direction and the time, and take a dated photo of the damage. If the stone came off a truck, note the company name and the truck number. Arizona's load law, A.R.S. § 28-1098, requires loads to be secured so nothing drops or escapes, but getting a trucking company to pay is a separate matter from replacing your glass.

We replace windshields; we do not repair chips. If the damage is in your line of sight or the crack is spreading, send us the photo and the VIN and we quote the exact glass for your car. Our longer post on bangautoglass.com covers the steps after a hit in more detail.

Stone strike on a Phoenix freeway?

Send the VIN for a quote on the exact glass your car needs. We come to your home or work, Monday to Saturday, 8am to 6pm.

Sources

Facts checked October 16, 2026

  1. New projects coming to Phoenix freeways in 2026, KTAR News, December 27, 2025 (citing ADOT)
  2. ADOT to begin major Phoenix-area freeway improvement projects in 2026, AZFamily, January 5, 2026
  3. Construction underway on Loop 303 extension into Goodyear, KJZZ, August 4, 2026
  4. Current closures and restrictions, Arizona Department of Transportation
  5. A.R.S. § 28-1098, vehicle loads, Arizona State Legislature

Things change. If something here is out of date, tell us on our Phoenix line, (602) 782-5144.

Free quote

What needs replacing on your car?

Four short steps, no account. Rather talk? Call our Phoenix line, (602) 782-5144.

  • OEM-quality glass matched to your vehicle
  • Installs Monday to Saturday, 8am–6pm, across Phoenix
  • Insurance or self-pay; we check your policy first

Step 1 of 4 · Glass

Which glass?
Your vehicle

Is there a camera behind the rearview mirror?

Unsure? Text us a photo of the glass

Where is the car?

We come to your home or work across the Phoenix area.

How are you paying?

Where should we send your quote?

4.5 on GoogleLifetime workmanship warrantyRather text? (877) 350-5962

Phoenix

Cracked glass in Phoenix? Start here.

CallTextGet a free quote